Home/Portfolio/Impact Modifiers/PVC Impact Modifier
PVC Impact Modifier — Plastics

Category · Impact Modifiers

Impact Modifier for PVC

Add toughness in profiles and pipes without giving up processability — with dosage support.

PlasticsConstruction
Request sample

Technical description

PVC profiles that crack on impact and pipes that fail drop tests are signs of low toughness — not only resin or process. Plectus Impact Modifier for PVC raises impact resistance in rigid formulas while keeping processability in extrusion of profiles, pipes and technical parts. Dosage support and documentation for qualification in your matrix.

We recommend evaluating polymer matrix, thermal cycle and process conditions before setting optimal dosage. Our application team supports lab and pilot trials through industrial qualification.

Click the items to see details

Applications

  • Rigid PVC profiles (windows, liners)
  • Pipes and fittings
  • Sheets and molded technical parts
  • Formulas needing impact toughness

Benefits

  • Higher impact toughness
  • Keeps extrusion processability
  • Suited to rigid profiles and pipes
  • Plectus technical support on dosage

Specifications

Technical category
Impact Modifiers
Segments served
Plastics · Construction
Documentation
Consult a specialist
Typical packaging
25 kg bags · Big-bag · IBC (on request)
Technical application — PVC Impact Modifier
Technical application · perfil de PVC rígido, tenacidade e controle de superfície

About the Impact Modifiers category

ABS, PVC, PP and PS impact modifiers for structural parts, profiles and packaging.

Frequently asked questions

How do I request the official product documentation?

Download the preliminary PDF above or contact us on WhatsApp — within one business day our engineering team returns signed documentation and the Certificate of Analysis (CoA) per lot.

Do you provide samples for testing?

Yes. We supply bench samples (≤ 1 kg) and pilot-scale quantities subject to technical evaluation of the use case.

Is there application support during qualification?

Yes. Our team follows the project from lab testing through industrial runs, adjusting dosage and process parameters.